• Surface and base repairs, rut filling, edge break repairs and a texture improvement slurry.
• 14mm bitumen rubber single seal application (24,7 km).
• 20mm/10mm bitumen rubber double seal application (5,0 km) with the exception of intersections.
• 50mm continuously graded asphalt overlay to intersections and through Pearston town (2,7 km).
• Construction of concrete edge beams to laybys and farm accesses.
• Concrete side drains and stone pitching.
• Application of road markings and installation of road studs.
• Construction of gravel shoulders.
• Construction of cemetery parking area.